top of page

STONE & GRAVEL

DELAWARES STONE AND GRAVEL CONTRACTOR

STONE DRIVEWAY PROCESS | PROJECT DAY OVERVIEW:
Step 1: Base - Stone and Gravel is a base. but if the surface level is low or needs leveled prior to adding stone. 
Step 2: Level off a maximum of 3" of stone. 
Step 3: Compact roll the driveway to settle stone into its final resting position.
Step 4: Sweep the surrounding area to clean up excess stone and debris.


HOW LONG DOES IT TAKE TO STONE MY DRIVEWAY?
Our estimates will include a start and end date. Most residential driveways are completed within 1-2 days. Some projects may require additional time depending on weather conditions and the size of the driveway. 

HOW MUCH DOES IT COST TO PUT STONE IN MY DRIVEWAY?
Between $1 to $3 per square foot. Depends on color and size of the stone you want. 

If you made it this far, then I think you are ready for FREE quote. Call or Text us today! We are here to help. 

SERVICES

YOUR LOCAL ASPHALT PAVING CONTRACTOR IN SEAFORD, DELAWARE

ASPHALT PAVING

  • New Construction

  • Driveways

  • Seasonal

REPAIR & RESTORE

  • Sealcoating

  • Crack Fill

  • Seasonal

STONE & GRAVEL

  • Decorative

  • Grading

  • Non-Seasonal

ASPHALT MILLINGS

  • Recycled Asphalt

  • Economical 

  • Non-Seasonal

203 William Ross Lane
Seaford, DE 19973

(443) 786-6922 | Call or Text

AsphaltPros-Black_Grey.png
  • Instagram
bottom of page